This checklist covers the tasks required to execute the SQDIMSU utility on z/OS. It assumes that either the IMS Log Reader or the IMS TM Exit Capture have been configured and that an Apply Engine script has already been prepared and tested.

#

Task

Sample JCL


Prepare Environment

1

Identify Source and Target System and Datastores

N/A

2

Determine the PSB requirements

N/A

3

Identify z/OS System LogStream to be utilized

N/A

5

Determine Scheduling Requirements

N/A


Environment Preparation Complete


Configure Utility

1

Prepare SQDIMSU Utility JCL

SQDIMSU


Utility Configuration Complete


Verification Tasks

1

Confirm that the correct CDCzLog Publisher and Apply Engine are running

Various

2

Run the SQDIMSU utility Job

SQDIMSU

3

Verify that the unloaded segments were applied to the target datastore

N/A


Verification Complete

The following sections focus on the Engine Configuration and communication with the Source platform Controller Daemon. Detailed descriptions of the other steps required to prepare the environment for Connect CDC SQData operation are described in previous sections.