Navigation: Change Data Capture > IMS z/OS > IMS TM EXIT Capture > Prepare Environment
Link-Edit External Subsystem Modules
Use JCL member SQDLINKS included in the distribution to re-link ALL of the ESS modules to be updated in the IMS RESLIB or JOBLIB/STEPLIB before IMS is brought up.