Step 8. Prepare to Link the Load Modules |
Scroll |
Edit the SQDLINK procedure in the SQDATA PROCLIB to specify the required system dataset names (i.e. Language Environment, IMS, CICS, Db2, etc.). The SQDLINK procedure contains instructions on the necessary modifications.