Please enable JavaScript to view this site.

Tab to the Unterse distribution data sets option, type s and press Enter.

Confirm the names of the input and output data sets. Input data sets are the product distribution libraries in Terse format. They will be unpacked into the output data sets shown on the panel.

------------------- SQData z/OS Installation ------------------

Command ===>                                                

                                                           

Specify data set names (from/to):                          

DBRM:        SQDATA.V40030.DBRMLIB.TERSE                    

to:          SQDATA.V40030.DBRMLIB                          

                                                           

CNTL         SQDATA.V40030.CNTL.TERSE                      

to:          SQDATA.V40030.CNTL                            

                                                           

PARMLIB      SQDATA.V40030.PARMLIB.TERSE                    

to:          SQDATA.V40030.PARMLIB                          

                                                           

PROCLIB      SQDATA.V40030.PROCLIB.TERSE                    

to:          SQDATA.V40030.PROCLIB                          

                                                           

SAMPLIB      SQDATA.V40030.SAMPLIB.TERSE                    

to:          SQDATA.V40030.SAMPLIB                          

                                                           

PGMOBJ       SQDATA.V40030.PGMOBJ.TERSE                    

to:          SQDATA.V40030.PGMOBJ                          

                                                           

Press ENTER to continue or F1 for help or F3 to return.  

Notes:

The default names are derived from the ISPF installation dialog data set name. Therefore, you must change the names as necessary for your environment.

Only the input data sets must already exist. The output data sets must not exist since they are created by the unpack job.

It is possible to override both the input and output names if required.

The file names will be verified, input files that they exist, and the opposite for output files.

The installation cannot proceed if errors are found. A pop-up window will appear for each error.

Confirm or correct the names of new data sets that are created by the unpack job.

Press Enter to continue to the next panel.

------------------- SQData z/OS Installation ------------------

Command ===>                                                    

                                                               

                                                               

Specify data set names (create new)                            

                                                               

FAILJCL      SQDATA.V40030.FAILJCL                            

                                                               

LOADLIB      SQDATA.V40030.LOADLIB                            

                                                               

                                                               

                                                               

SMS Storage Class for new data sets (Optional):                

                                                               

STORCLAS     <Confirm>__                                      

                                                               

                                                             

Press ENTER to continue or F1 for help or F3 to return.

Notes:

These data sets must not already exist.

The default names are derived from the ISPF installation dialog data set name. Therefore, change the names as necessary for your environment.

Confirm the STORCLAS because the size of the PGMOBJ Library may exceed system defaults. While the size of the Tersed file is approximately 70 MB you should anticipate the untersed file may take over 400 Cylinders and the LOADLIB created by the subsequent Link Job more than 100 Cylinders..

File Name

Contents

Tersed File Size

SQDATA.ZOS.V4nnnn.PBMOBJ.TERSE

Object modules for the Base Product

70 MB

Confirm or correct the names of new data sets.

Press Enter to continue.

At this point a job is built with all names and file sizes, etc., and is prepared for submission. This will define each output file and execute the terse steps. You should review and verify that the generated JCL and parameters are correct.

Type SUBMIT on the command line and press ENTER to run the job, confirm that it was successful before continuing.