Before You Get Started |
Scroll |
This checklist covers the tasks required to prepare the operating environment and configure the Db2 Log Reader Capture. Before beginning these tasks however, the base product must be installed. Refer to the Connect CDC SQData zOS Installation Guide for instructions and prerequisites.
# |
Task |
Sample JCL |
Prepare Environment |
||
1 |
Identify Source and Target System and Datastores |
N/A |
2 |
Confirm/Install Db2 Replication Related APARS |
N/A |
3 |
Modify PROCLIB Members |
N/A |
4 |
Verify that the Connect CDC SQData product is Linked |
SQDLINK |
5 |
Bind the Db2 Package |
BINDSQD |
6 |
Verify APF Authorization of Connect CDC SQData LOADLIB |
N/A |
7 |
Create ZFS Variable directories |
ALLOCZDR |
8 |
Reserve TCP/IP Ports |
N/A |
9 |
Authorize zFS User and Started Task IDs and specify MMAPAREAMAX |
RACFZFS |
10 |
Prepare Db2 for Capture |
DB2GRANT |
11 |
Generate z/OS Public/Private keys and Authorized Key Files |
NACLKEYS |
Environment Preparation Complete |
Each of these steps are described in detail in the Db2 z/OS Capture reference.