Please enable JavaScript to view this site.

Navigation: Quickstart Guides > Db2/z Quickstart

Before You Get Started

Scroll

This checklist covers the tasks required to prepare the operating environment and configure the Db2 Log Reader Capture. Before beginning these tasks however, the base product must be installed. Refer to the Connect CDC SQData zOS Installation Guide for instructions and prerequisites.

#

Task

Sample JCL


Prepare Environment

1

Identify Source and Target System and Datastores

N/A

2

Confirm/Install Db2 Replication Related APARS

N/A

3

Modify PROCLIB Members

N/A

4

Verify that the Connect CDC SQData product is Linked

SQDLINK

5

Bind the Db2 Package

BINDSQD

6

Verify APF Authorization of Connect CDC SQData LOADLIB

N/A

7

Create ZFS Variable directories

ALLOCZDR

8

Reserve TCP/IP Ports

N/A

9

Authorize zFS User and Started Task IDs and specify MMAPAREAMAX

RACFZFS

10

Prepare Db2 for Capture

DB2GRANT

11

Generate z/OS Public/Private keys and Authorized Key Files

NACLKEYS


Environment Preparation Complete

Each of these steps are described in detail in the Db2 z/OS Capture reference.